So I have a VR project I'm working on that requires me to stabilize 14 camera angles at 1920 x 1440 and 80 FPS. I left the computer on an analysis pass overnight and came into work in the morning... it had crashed during the last autosave. argh. I looked at the project file and it was 172 MB. I knew this could be a factor as it stores that info in the project file. I even gave "other apps" an allowance of 30 gb of RAM (something I saw Todd had suggested in another forum). I should have turned autosave off. However if AE can't handle simultaneous analysis passes in one project, and needs each 3 minute clip in its own project file, how do I open multiple instances of AE to run them concurrently? is this even possible?Â
Anyone know of a better way to do this? Thinking I may need to use boujou instead...
--
_____________________________
VFX & Motion Graphic Artist
teddygage dot com